3D Modeling, Steel Detailing & Digital Engineering
DBM Vircon, a premier construction modeling, detailing and digital engineering company, delivers high-profile projects with state-of-the-art technology, uncompromising detail and millimeter precision.
We will call you and discuss your project needs in detail.
TRUSTED BY
-
Hong Kong
Hong Kong International Airport 3 Runway Concourse
With a project capex of $US18 billion US dollars, Hong Kong International Airport (HKIA) is Hong Kong’s largest ever infrastructure spend and DBM Vircon’s largest ever project in Asia.
With a project capex of $US18 billion US dollars, Hong Kong International Airport (HKIA) is Hong Kong’s largest ever infrastructure spend and DBM Vircon’s largest ever project in Asia. To meet future air traffic growth and maintain Hong Kong’s competitiveness as an international aviation hub, Airport Authority Hong Kong has embarked upon a major expansion project that will see Hong HKIA become a Three-runway System (3RS).
The 3RS project is more than a new runway. Its scale is almost equivalent to building a new airport next to the existing one. A key element of the project...
-
Austin, Texas, USA
Austin Q2 Stadium
Spread across 465,000 square feet with a construction cost of $260 million, the new Q2 Stadium in Austin, Texas, USA, is home to the Austin Football Club (Austin FC). The stadium opened in June 2021 and was built to coincide with the team’s first season within the MLS (Major League Soccer).
The Q2 stadium boasts the second largest roof of any MLS stadium and is capable of hosting over 20,000 fans. The steel cable-supported roof canopy is designed to draw in outside breezes so that the lower bowl is a...
-
Nashville, United States
Geodis Park
Located at the historic Nashville Fairgrounds in Nashville, Tennessee, Geodis Park has the capacity to accommodate up to 30,000 fans. Home to the Nashville SC, the stadium was built in time to coincide with the team’s third season in the MLS (Major League Soccer) and is the largest stadium dedicated to soccer in the United States and Canada.
The venue is designed with four distinct stands, in keeping with the traditional European design of soccer stadiums. Geodis Park boasts a large, 360-degree canopy supported by slender steel columns and a large, signature X-frame at the back. Th...
-
Santa Clara, California
NVIDIA Phase II
Located in Santa Clara, NVIDIA II is the second phase of construction at NVIDIA‘s California-based headquarters. Designed in a futuristic style, Phase II, called Voyager, is approximately 750,000 square feet and designed to demonstrate design from the inside out.
Located in Santa Clara, NVIDIA II is the second phase of construction at NVIDIA’s California-based headquarters. Designed in a futuristic style, Phase II, called Voyager, is approximately 750,000 square feet and designed to demonstrate design from the inside out.
The building’s sculptural roof is complex and consists of a series of triangular, raking roof panels to create an undulating roof. Several skylights are in place to allow ample diffused daylight to enter th...
-
West Hollywood, California
The West Hollywood Sunset Spectacular
The West Hollywood Sunset Spectacular is a multimedia billboard for the 21st century. It is comprised of four giant parts: three outer panels arranged in a triangular pattern, with a ‘tesseract’ nested inside. At 64 feet high, the huge billboard is made from perforated metal, with the east and west-facing outer petals featuring embedded high-resolution LED technology.
The West Hollywood Sunset Spectacular is a multimedia billboard for the 21st century. It is comprised of four giant parts: three outer panels arranged in a triangular pattern, with a ‘tesseract’ nested inside. At 64 feet high, the huge billboard is made from perforated metal, with the east and west-facing outer petals featuring embedded high-resolution LED technology.
The three towering petals surround a pedestrian-accessible central void. Suspended overhead is a sculptural entity that ap...
-
Perth, Western Australia
Perth Children’s Hospital
The Perth’s Children’s Hospital provides state of the art clinical care for future generations and facilities for pediatric research. It holds 298 beds, inpatient and outpatient care, ambulatory services and will house the State’s first paediatric trauma center.
DBM Vircon’s Scope of Work:
DBM Vircon was responsible for the entirety of the BIM strategy, implementation and management for the project, and...
-
Los Angeles, California
AMMP – David Geffen Theater
The Academy Museum of Motion Pictures, located on the corner of Wilshire Boulevard and Fairfax Avenue along Los Angeles’ Museum Mile, is a museum dedicated to exhibiting the art and science of movies.
Geffen Theater Project Overview:
The 300,000 square-foot facility is the nation’s first, large-scale museum entirely dedicated to the art, science, craft, business, and history of movies. The museum features exhibits fro...
-
Hong Kong
Hong Kong International Airport 3 Runway Concourse
With a project capex of $US18 billion US dollars, Hong Kong International Airport (HKIA) is Hong Kong’s largest ever infrastructure spend and DBM Vircon’s largest ever project in Asia.
With a project capex of $US18 billion US dollars, Hong Kong International Airport (HKIA) is Hong Kong’s largest ever infrastructure spend and DBM Vircon’s largest ever project in Asia. To meet future air traffic growth and maintain Hong Kong’s competitiveness as an international aviation hub, Airport Authority Hong Kong has embarked upon a major expansion project that will see Hong HKIA become a Three-runway System (3RS).
The 3RS project is more than a new runway. Its scale is almost equivalent to building a new airport next to the existing one. A key element of the project...
-
Austin, Texas, USA
Austin Q2 Stadium
Spread across 465,000 square feet with a construction cost of $260 million, the new Q2 Stadium in Austin, Texas, USA, is home to the Austin Football Club (Austin FC). The stadium opened in June 2021 and was built to coincide with the team’s first season within the MLS (Major League Soccer).
The Q2 stadium boasts the second largest roof of any MLS stadium and is capable of hosting over 20,000 fans. The steel cable-supported roof canopy is designed to draw in outside breezes so that the lower bowl is a...
-
Nashville, United States
Geodis Park
Located at the historic Nashville Fairgrounds in Nashville, Tennessee, Geodis Park has the capacity to accommodate up to 30,000 fans. Home to the Nashville SC, the stadium was built in time to coincide with the team’s third season in the MLS (Major League Soccer) and is the largest stadium dedicated to soccer in the United States and Canada.
The venue is designed with four distinct stands, in keeping with the traditional European design of soccer stadiums. Geodis Park boasts a large, 360-degree canopy supported by slender steel columns and a large, signature X-frame at the back. Th...
-
Santa Clara, California
NVIDIA Phase II
Located in Santa Clara, NVIDIA II is the second phase of construction at NVIDIA‘s California-based headquarters. Designed in a futuristic style, Phase II, called Voyager, is approximately 750,000 square feet and designed to demonstrate design from the inside out.
Located in Santa Clara, NVIDIA II is the second phase of construction at NVIDIA’s California-based headquarters. Designed in a futuristic style, Phase II, called Voyager, is approximately 750,000 square feet and designed to demonstrate design from the inside out.
The building’s sculptural roof is complex and consists of a series of triangular, raking roof panels to create an undulating roof. Several skylights are in place to allow ample diffused daylight to enter th...
-
West Hollywood, California
The West Hollywood Sunset Spectacular
The West Hollywood Sunset Spectacular is a multimedia billboard for the 21st century. It is comprised of four giant parts: three outer panels arranged in a triangular pattern, with a ‘tesseract’ nested inside. At 64 feet high, the huge billboard is made from perforated metal, with the east and west-facing outer petals featuring embedded high-resolution LED technology.
The West Hollywood Sunset Spectacular is a multimedia billboard for the 21st century. It is comprised of four giant parts: three outer panels arranged in a triangular pattern, with a ‘tesseract’ nested inside. At 64 feet high, the huge billboard is made from perforated metal, with the east and west-facing outer petals featuring embedded high-resolution LED technology.
The three towering petals surround a pedestrian-accessible central void. Suspended overhead is a sculptural entity that ap...
-
Perth, Western Australia
Perth Children’s Hospital
The Perth’s Children’s Hospital provides state of the art clinical care for future generations and facilities for pediatric research. It holds 298 beds, inpatient and outpatient care, ambulatory services and will house the State’s first paediatric trauma center.
DBM Vircon’s Scope of Work:
DBM Vircon was responsible for the entirety of the BIM strategy, implementation and management for the project, and...
-
Los Angeles, California
AMMP – David Geffen Theater
The Academy Museum of Motion Pictures, located on the corner of Wilshire Boulevard and Fairfax Avenue along Los Angeles’ Museum Mile, is a museum dedicated to exhibiting the art and science of movies.
Geffen Theater Project Overview:
The 300,000 square-foot facility is the nation’s first, large-scale museum entirely dedicated to the art, science, craft, business, and history of movies. The museum features exhibits fro...
Why DBM Vircon
Cutting Edge Technology
Innovation in thought and tools (like Tekla, Prosteel, Revit, Plant 3D, Navisworks, and iConstruct) are fundamental to our approach, and critical to the accuracy of your project.
Multi-Disciplined Approach
DBM Vircon regularly collaborates in multi-disciplinary teams and environments, working alongside engineers, fabricators, and civil teams to deliver the best possible outcome for your project.
Over 55 Years’ Experience
With experience on global projects since 1964, and the tenure of many of our people spanning over 30 years, DBM Vircon has the expertise, systems, and capabilities to deliver your entire project.
Global Presence
With offices around the world, we offer 24-hour support – when our Perth office closes, our London office opens. This means we can meet the tightest of schedules and mitigate delays.
Cost Confidence
By eradicating clashes and design errors early on, rework and delays are significantly reduced, costs are confirmed in advance, and highly accurate fabrication quotes can be provided without risk of variations.
Schedule Certainty
Our methodology avoids duplication of modeling activities typically experienced in the traditional 2D modeling environment. With a more accurate design completed earlier, schedule certainty is improved and fabrication commences earlier.
Sophisticated Systems
Boasting global recognition, our custom-built proprietary Job Management System (JMS) is specifically designed to effectively and efficiently manage models, drawings, data, documentation and deliverables for complex projects.
Stringent Quality Control
Not only is DBM Vircon ISO 9001 certified, we utilize rigorous quality assurance processes. All drawings are checked by our quality assurance system, with queries, variations and changes closed out by the project engineer before delivery to you.
Our Locations
Having offices around the world means that DBM Vircon can work in any time zone, and offer schedule efficiencies by working on your project around the clock.
Over five decades of experience
Through 2016 and 2017, our parent company DBM Global acquired the top modeling and detailing brands in the world, each with deep expertise in their sector, and proven innovative approaches and delivery methods. These brands were brought together as DBM Vircon. Today, we have operations across four continents in eight countries, forming one of the most comprehensive and sophisticated 3D Modeling, Detailing and Digital Engineering companies in the world. With over 55 years’ experience in more than 25 countries worldwide, when you partner with DBM Vircon you gain access to a team of over 900 highly-trained professionals.
We will call you and discuss your project needs in detail.
Meet some of our people:
DBM Vircon’s reputation and success hinges on attracting and retaining the industry’s most talented people, and fostering an innovative culture. We strive to be at the leading edge of our niche.
Mark Campbell, DBM Vircon CEO
Mark Campbell
Gino Pezzente
Alastair Brook
Emily Bates
We’re certified
DBM Vircon adheres to the highest quality assurance standards, and maintains memberships and certifications in technical institutes across many countries and industries, ensuring that our clients can be guaranteed fewer errors and best-in-class deliverables.
We will call you and discuss your project needs in detail.
Communicated complex information effectively to all levels of the team
“DBM Vircon has provided top-level service and worked collaboratively with LCPL using large and complex levels of information to produce a format that can communicate effectively with all levels of the construction team. This effort required the coordination of multiple design and information sources, which were predominantly international design houses managed by others.”
High quality engineering solutions that enabled us to deliver projects on time and within budget
“DBM Vircon has supported us in providing high-quality innovative engineering solutions that has enabled us to deliver projects on time and within budget. DBM Vircon understands the high standards that we demand in the delivery of our projects, and the importance that we place on safety, quality, and customer satisfaction. DBM Vircon has proven to be an invaluable partner in helping us achieve our goals and we would highly recommend working with them.”
Very strong knowledge in design and detailing of materials handling systems
“DBM Vircon have provided Kerman with highly innovative engineering solutions which allowed Kerman to deliver projects safely, on time and budget. Our overall experience with the services provided by DBM Vircon are very good. In comparison to their competitors, DBM Vircon have shown to be very flexible to work with and have a very strong knowledge in design and detailing of materials handling systems. DBM Vircon understands the high standards we demand in the delivery of our projects, and the importance that we place on safety, quality and customer satisfaction. DBM Vircon have proven to be an invaluable partner in helping us achieve those high standards. I would highly recommend working with them.”
One of our best engineering services suppliers
“Our experience in doing business with DBM Vircon has always been an enjoyable one. So much of the work is done on the front end of a project that is critical to its success, that the quality and accuracy that DBM Vircon provide is critical to our own success. They have continually approached our projects with proficiency, and the level of responsiveness they offer during those crucial times is reassuring. They are not only capable, but also down to earth and easy to work with in a team environment; this is why we rate them as one of our best engineering services suppliers. I would not hesitate to recommend DBM Vircon to anyone requiring engineering services.”
A partner committed to exploring new options and delivering economical solutions
“Barton Malow has been developing a new delivery model for complex structural steel projects and has found in DBM Vircon a partner committed to exploring new options and delivering economical solutions. DBM Vircon was selected as the best qualified firm based upon a bid and qualifications selection process. With their help, we retained responsibility for performance of the connection design and detailing. Together we developed a highly detailed set of bid documents for fabrication and erection which significantly advanced the schedule. Throughout the project DBM Vircon has played a vital role in recognizing the impact of significant design changes and working with the entire project team to find ways to recover any schedule impacts that these created. DBM Vircon’s core technical competence, flexibility and commitment to economy have been and continue to be key parts of our team’s success!”
One of the most comprehensive BIM projects in the world
“Queen’s Wharf is arguably one of the most comprehensive BIM projects in the world today and is an excellent example of how digital technologies are improving traditional design construction and facilities management.”
Their ability to easily manage the complexities associated with retrofitting a historic 90-year-old bridge greatly exceeded my expectations
“It is impossible to imagine the Peace Bridge Rehabilitation project going as well without DBM Vircon’s direct involvement. Their ability to easily manage the complexities associated with retrofitting a historic 90-year-old bridge greatly exceeded my expectations. Throughout the entire detailing process, I was continuously astonished by their modeling capabilities and attention to detail. It was truly a pleasure working with them and look forward to future projects.”
In-depth knowledge of steel fabrication and erection based on experience
“DBM Vircon’s quality work and sensitivity to fast track schedules help make projects a success. Their willingness to accommodate fabricators & erectors specific needs coupled with timely submittal schedules is also evident. Their in-depth knowledge of steel fabrication and erection is obviously founded on a sound base of experience.”
With 4 towers, an integrated resort including gaming and entertainment, 2000 keys across hotel and residential, and an evolving procurement strategy, we had a very unique opportunity on our hands.
“When Destination Brisbane Consortium won the bid to develop and deliver Queens Wharf Brisbane, we knew we would require comprehensive document control and digital tools to ensure successful project completion and handover to operations. Due to the complexity of the project and a requirement to manage the facility for the next 99 years, integration of Digital Engineering processes from project inception to Facilities Management was a no brainer. DBM Vircon wrote the project DE strategy, briefed design phase consultants, are managing and federating the day to day delivery of 1000’s of models in varying formats, and monitoring the contractors’ deliverables to ensure the Facilities Management requirements are achieved. They are managing all of the above while providing us unrivaled transparency into the project’s development throughout the design and construction process.”
DBM Vircon brought a level of vision and smarts to the table that has put our project on the leading edge of how large-scale infrastructure projects like ours build and utilise 3D models.
“Cross River Rail Development Authority went to the market with an ambitious scope of works for BIM, GIS and Gamification. DBM Vircon brought to the project a multi-talented team with diverse experiences to deliver leading edge services. From a digital strategy, specifications, and management plans to a Smart City database proposal, model preparation, federation, gamification, virtual reality and polished communications products - DBM Vircon and their partners took the initiative and were able to deliver. They created credible, bespoke technology solutions despite tight timelines, as well as being able to integrate into traditional major infrastructure procurement and delivery team processes.”
The DBM Vircon Visualization team came recommended to my team from colleagues at BHP, having done animations before on similar projects.
“We were looking for a new, bespoke way to visually demonstrate mining approaches for internal use. The team at DBM Vircon worked collaboratively with us to quickly pull together multiple versions and accommodated with many revisions and last-minute changes. Their agile delivery style was complemented by their expert advice around what would work, and what wouldn’t in the context of the end animation. Our experience on this project very positive and overall, the team was happy with the final animation produced.”
As we embarked on our Digital Engineering Transformation journey, we sought a seasoned and forward-thinking partner capable of navigating us through the intricacies of BIM, information management, 3D design tools, and Common Data Environment setup.
“DBM Vircon not only seamlessly aligned their methodologies with our own design and delivery process, but also added value across various business functions at Powerlink Queensland. Their expertise has resulted in actionable insights through smart data management and has empowered us with modern information management practices. The engagement has significantly enhanced our operational transparency, facilitating rapid, data-driven decisions and reducing project risk substantially.”