CLIENT: | ENI Australia |
LOCATION: | Northern Territory Australia |
COMPLETION DATE: | 2010 |
Blacktip Gas field holds an estimated 933 billion standard cubic feet of raw gas and 5.7 million barrels of condensate. The field consists of two production wells tied-back to a wellhead platform, which is connected to a 108-km pipeline. The pipeline exports the gas to shore to a process plant located 2.5 km onshore. The condensate is exported by seaborne tankers via a subsea export pipeline approximately 3 km in length and sent to Rio Tinto Alcan’s alumina refinery situated at Gove in the Northern Territory.
DBM Vircon’s scope entailed structural, civil and piping design and structural detailing for the Onshore Process Plant including production modules, pipe supports, pipe racks and associated skids. Scope included connecting various plant services within the modularized gas plant and interfacing with designated tie-in positions for onsite hook-up locations. Services included Piping Isometrics, Material Take-offs, Pipe Supports and Document Schedules.
It is our unique combination of experience, expertise and technology that turns complex data into intelligent and context rich models.
© 2024 DBM Vircon | Web design by Excite Media | Privacy Policy
© 2023 DBM Vircon | Web design by Excite Media
Privacy Policy