EPCs

Improve Efficiency Throughout the Asset Lifecycle

Reliability and Precision

Major building and construction projects, as well as planned maintenance activities such as plant shut-downs, tend to be characterised by time delays, materials waste and cost overruns. The financial burden of these inefficiencies is, generally, borne by building and asset owners—or, in the case of Engineering, Procurement and Construction Contractors, by you.

Intelligent Data for Accuracy and Consistency

We integrate intelligent data into millimetre perfect models to emulate structural drawings and specifications exactly for easy validation, visualisation and approval. Our models can also be used to generate highly accurate production drawings, enabling you to utilise techniques such as prefabrication and modular construction. By designing, detailing and building offsite in a controlled environment, you can diminish waste, increase your efficiency and reduce labour and material costs.

Mitigate Errors and Accelerate Timeframes

DBM Vircon can help you improve efficiencies throughout the lifecycle of an asset from the design and construction stages, right through to asset or facility handover. With clashes and design errors detected early on, rework and delays are reduced, significantly improving scheduling certainty and even slashing project timeframes by up to 12%. As a result, costs are reduced and you receive highly accurate sub-contractor quotes without risk of variations or RFIs.

Accurate, Optimised Structural Drawings and Specifications

Win Competitive Bids

​Win more competitive bids by incorporating our superior quality, highly accurate 3D visualisations of facility walkthroughs, 4D modelling, site logistics and more in your next marketing presentation.

Eradicate Design Errors

Integrating data from all design disciplines and streamlining team communication resolves poor design documentation and reduces clashes, so complex building systems are right—the first time.

Reduced Costs and Accurate Quotes

When eradication of rework, duplication and delays is combined with reduced design errors, scheduling certainty and slashed timeframes, costs are reduced and contractor quotes are accurate.

Streamline Government Approvals

Proposed developments can be rejected due to uncertainty around their appearance. Accurate, realistic 3D visualisations reduce this uncertainty, increasing the likelihood of government approval.

Modern Construction Methodology

With all stakeholders able to visualise the construction timeline, critical issues and clashes can be effortlessly identified, with necessary changes to your construction schedule being managed with ease.

Improved Site Safety

Significant error and risk can occur during construction and ongoing maintenance. Millimetre perfect modelling ensures minimal rework, reduces hours on-site and helps address safety concerns.

Enhanced Environmental Impact

Lean and repeatable designs consider operational issues as well as construction requirements to reduce waste and site clearances, deliver more efficient design and assist in community engagement.

Modeling & Detailing

Architectural &
Building Systems

Civil

Concrete & Rebar

Mechanical Platework

Piping

Scan to BIM

Structural Steel

Tanks & Vessels

Vendor &
Mechanical Equipment

Digital Engineering

Strategy & Execution

Visualization

Making Design Constructible

Design Assist

Integrated Project Delivery

Precon Planning

Learn More About How DBM Vircon
Makes Design Constructible

Gain Schedule Certainty.
Reduce Costs.